Proposed model optimally determines the location, number and type of tower cranes required and the location and number of material supply points. Also, the height of overlapping cranes is determined to prevent cranes from colliding with each other and to reduce possible stops in the optimization process. This code is implemented in OPL software.
-
Notifications
You must be signed in to change notification settings - Fork 0
Proposed model optimally determines the location, number and type of tower cranes required and the location and number of material supply points. Also, the height of overlapping cranes is determined to prevent cranes from colliding with each other and to reduce possible stops in the optimization process. This code is implemented in OPL software.
smartconstructiongroup/Locating-Tower-Cranes
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
About
Proposed model optimally determines the location, number and type of tower cranes required and the location and number of material supply points. Also, the height of overlapping cranes is determined to prevent cranes from colliding with each other and to reduce possible stops in the optimization process. This code is implemented in OPL software.
Resources
Stars
Watchers
Forks
Releases
No releases published
Packages 0
No packages published